We recommand the following configuration tips when you try to configure the Smartmaster Pro with Alfen EVE Double Charger

  • TIP 1: The serial number to be used in the smartmaster can be found in the paper documents supplied or the identification label on the underside of your charging station.
  • TIP 2: ACE Devices installer => static load balancing must be selected.
  • TIP 3: ACE Devices installer => Back office URL => SmartMaster IP ( ws://X.X.X.X:8834/ocpp).
  • TIP 4: Check the device’s IP, It’s must be in the same network as the SmartMaster.
  • TIP 5: ACE Devices installer => connectivity=>Meter value=>meter value sample interval = 60S
  • Tip 6: ACE Devices installer => connectivity=>Meter value=>meter values sampled data =
    • Sampled data 1 = Energy.Active.Import. register
    • Sampled data 2 = Current.Import
    • Sampled data 1 = Current.Offered

You can also download our Tips here

Updated on 2024-03-12

NEXXT NEWS

Stay updated with our Nexxt News newsletter! Receive updates on our blog articles, event participation, company news, and other exciting announcements. Be the first to know about our latest insights and developments.