We recommand the following configuration tips when you try to configure the Smartmaster Pro with Etrel Charger

  • TIP 1: Enabling IPv6 connectivity (if you use windows) and type : http://<charger serial>.local/ (serial number can be found inside of Inch Duo on right panel)
  • TIP 2: Central System endpoint URL (ws://{SMARTMASTER_IP_ADDR}:8834/ocpp).
  • TIP 3: allow that charge point operator is remotely setting load schedules.
  • TIP 4: select sampled meter value types.

You can also download our Tips here

Updated on 2024-03-12

NEXXT NEWS

Stay updated with our Nexxt News newsletter! Receive updates on our blog articles, event participation, company news, and other exciting announcements. Be the first to know about our latest insights and developments.